Geotechnical Engineering & Construction Materials Testing
Samsung Austin FAB 2 Office Building
View Project Photos

Project Description

Arias provided Geotechnical Engineering and Construction Materials Testing services for the expansion of the Samsung Fab 2 Office Building in Austin, Texas. Services consisted of foundation and structure for a new 3-story, 150,000 square foot office building.

The cast-in place structural concrete structure has a footprint of approximately 50,000 square feet, and will be founded on drilled piers, with the ground floor cast free of grade. Floor slabs are pan joists and include post-tensioned girders. The loading dock is ground-supported.

At the time of its construction, the Samsung Austin Fab 2 was the largest wafer fabrication facility in the United States. Operationally, the Samsung Fab 2 building is a chip fabrication facility for commercial production of advanced flash memory chips.

Project Details

Location:

Austin, Texas

Completion Date:

October 2017

Service Provided:

Geotechnical Engineering & Construction Materials Testing

Project Photos

There are no project photos available at this time.
Back to all projects

connect with us

For more information about our company, services, experience, or to partner on an upcoming project.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.